2025 During the operation of chemical plants, the safety level and operational stability of rotating equipment such as industrial pumps play a critical role, directly impac...
27/11/25
2025 In petrochemical plants, air cooling tower systems play an important role in supporting stable plant operation. The fan assembly is one of the key components in these ...
31/10/25
Project Scope The AFC Project covers the provision of design, modification, site installation, and performance testing for the AFC system, aiming to enhance operational rel...
23/10/25
January 2025 In 2024, Khanh Linh Equipment & Engineering (KLE) successfully executed a supply order for standby couplings for pumps and compressors at the Long Son Petr...
31/01/25
September 2024 In 2024, Khanh Linh Equipment & Engineering JSC (KLE) implemented a project to upgrade the Mechanical Seal and Seal Plan system for the hydrocarbon pump ...
30/09/24
April, 2024 In 2023, Khanh Linh Equipment & Engineering (KLE) successfully executed a project to provide overhaul services for Dresser-Rand compressors (LP & HP) fo...
14/08/23
May 2023 In BOPP film production lines, particularly during the operation of extrusion and stretching equipment, the quality and stability of the filtration system play a c...
31/05/23